Cranberry Township Acoustic Silencers
Location: Cranberry, PA
Replace five existing underperforming acoustic silencers.

Polk Water Treatment Plant
Location: Polk, PA
New water treatment facility for Polk State Hospital.

PSU Water Treatment Plant | Wet Pipe System Installations
Location: State College, PA
Engineering, fabrication and installation of a Wet Pipe System.

Sheffield Terrace Booster Station
Location: Aliquippa, PA
New booster station to service Aliquippa drinking water requirements. We built up the suction and discharge headers in our fab shop to attempt to minimize site time.

Skid Fabrication for Power Plant
Location: Erie, PA / Georgia
Design and fabricate 13 skids (20 skid sections) for a new flue gas desulfurization (FGD) wastewater treatment plant at a large power plant in Georgia.

Wasielewski Water Treatment Plant
Location: Erie, PA
One of the largest retrofitted membrane filtration water treatment plant in the U.S. Spaeder installed all plumbing and process piping.